ELEVATED WALKWAY

The elevated walkway over 7th Street was added to create a seamless connection from Target Field to the Skyway system and Ramp A.


The project was designed and constructed by the Ballpark Project team and funded by MnDOT.

BEFORE AND AFTER

ELEVATED WALKWAY

AFTER

BEFORE